Air box & FWF

Total time: 2846.5
Filtered Air Box: 41.0
Firewall forward this time: 32.5
Total Firewall Forward:  69.6

Did the filtered air box and the air channel from the lower cowl to the air box. Had to do the air channel twice but that was the only real issue with the FAB.

For the FWF the prop was torqued and safety wired. FWF wiring has been completed, throttle body complete. Cabled complete. Fuel lines and oil lines complete. Several issues with the control cables documented in the pictures but all is well now. 

Comments are closed.